Приложение к письму KEY PERFORMANCE INDICATORS (KPI) 1. 2. 3. 4. 5. 6. 7. 8. Expected Outputs Report on LAN and data centre setup (see above points 2, 3 and 4), in English or Russian, confirmed by Lesproyect memo Mediawiki or similar web-based documentation system installed and configured (see above point 5), confirmed by Lesproyect memo Training on the DB&IT best practices delivered (see above point 7), verification by support materials and Lesproyect memo Support in preparation of field survey delivered in autumn 2019 (see above point 10), confirmed by Lesproyect memo Support in preparation of field survey delivered for 2020 spring campaign (see above point 12), confirmed by Lesproyect memo Support in forest inventory evaluation provided (see above point 13), confirmation by Lesproyect memo Support of Lesproyect in data management and forest monitoring information system development provided (see above point 14), confirmed by Lesproyect memo Training on field data collection performed (see above point 7), confirmed by Lesproyect memo 23 Apr 2020 9. Working instructions for field data collection compiled (see above point 6) Data Mar/2021 Mar/2021 Apr/2021 Mar, Apr, May/2021 Aug, Sep, Nov/2021 During the 2021 During the 2021 Apr/2021 Mar, Apr, May/2021 Responsible consultant National DB&IT consultant, Mr Farhod Omanov National DB&IT consultant, Mr Farhod Omanov National DB&IT consultant, Mr Farhod Omanov National DB&IT consultant, Mr Farhod Omanov National DB&IT consultant, Mr Farhod Omanov National DB&IT consultant, Mr Farhod Omanov National DB&IT consultant, Mr Farhod Omanov National consultant on FIMS&FI, Mr Marat Embergenov National consultant on FIMS&FI, Mr Marat Embergenov 10. General assistance Lesproyect with regard of GIS data provided (see above point 6), confirmation by memo issued by Lesproyect Mar,Apr,May,Jun/2021 National GIS consultant, Mr Utkir Shermanov 11. Support of Lesproyect in provision of base maps for Leskhoz level inventories (spring campaign, see the above point No 5), confirmation by memo issued by Lesproyect Mar, Apr/2021 National RS consultant, Mr Sherzod Zaitov 12. Support of Lesproyect in provision of base maps for Leskhoz level inventories (autumn campaign, see the above point No 5), confirmation by memo issued by Lesproyect May, Jun/2021 National RS consultant, Mr Sherzod Zaitov 13. Output 1.1: A harmonized methodology for data collection developed 14. Output 1.2: A trained cadre of staff to undertake the data collection and information management available 15. Output 1.3: A geo-referenced database in place 16. Output 1.4: A Forest information and Monitoring System functional 17. Output 4.1: A set of manuals or guidelines, that capture and describe the improved practices, measures and technologies During the 2021 During the 2021 Team Component 1 During the 2021 During the 2021 Apr, May/2021 Team Component 1 Team Component 1 Team Component 1 Team Component 1