Uploaded by Abdurashid Abdumurodov

Tarjima boybutayevga

advertisement
SIMULATION OF BALL MILLS UNDER UNCERTAINTY
CONDITIONS
The separation of rare and precious metals from ore is associated with its
grinding. Ball, rod, semi-autogenous and autogenous mills are used for grinding ore.
The mill of the latter type uses only the ore itself as the grinding medium, while in
semi-autogenous and ball mills, along with ore, steel balls are used as the grinding
medium. Let us consider in more detail the grinding process in a ball mill, where the
material to be ground is part of the grinding medium. Changes in the state of ore
before and during grinding is a significant factor of uncertainty in the modeling and
control of the grinding process. The composition of the ore in terms of particle size
and their hardness and distribution in the medium being ground affects the grinding
kinetics, which also contributes to the uncertainty. No improvement in the design of
the ball mill can solve this problem. In order to reduce the influence of these
uncertainties in the control of this process, closed-loop circuits are used [1]. For
example, the main controlled parameters of the grinding process are the size of
particles at the outlet of the apparatus, and it is not possible to carry out continuous
automatic control over the size of particles in the apparatus and the hardness of the
grinding medium in the apparatus, which leads to the impossibility of controlling the
influence of disturbing influences and, accordingly, to the uncertainty of the
dynamics of the process. [2].
Grinding technological schemes can have various configurations. To control
the grinding process, block predictive models are often used [3], consisting of
separate modules, for example, for the mill itself, cyclone of water and sump [4].
The block principle of creating a model allows you to simulate the process for
various configurations of the grinding technological scheme. In this case, the
nonlinearity of the technological process and the uncertainties described above are
taken into account in the control system. Grinding process control pursues several
goals, firstly, to stabilize the system, and secondly, to optimize the technological
process [7]. The economic goal consists of several components, each of which
contributes to the achievement of the overall economic goal of the grinding process.
The components of the economic goal are:
• improving the quality of products, which consists in stabilizing the fineness of
grinding and minimizing fluctuations in the size of the product;
• maximizing productivity;
• minimizing the number of steel balls used per ton of product produced;
• minimizing energy consumption for each ton of products produced, etc.
All these goals are interrelated and require a certain compromise solution, since, for
example, productivity cannot be increased to certain values without compromising
product quality. The problem of controlling the grinding process is to concider the
strong correlation between the variables, long time delays, uncontrolled
disturbances, changes in parameters over time, the nonlinearity of the process and
the non-optimality of the design of the grinding plant. [5, 6]. This is achieved by
introducing uncertainties and deviations from the process into the predictive model.
The control system calculates the optimal sequence of controls or generates certain
feedback laws that optimize a given objective function.
Let's construct a dynamic mathematical model of a ball mill shown in Figure 1. The
mill consists of a mill itself, a sump and a cyclone of water.
Figure 1. Ball mill for grinding ore.
As can be seen from the figure, ore is fed into the mill together with grinding balls,
water and a reverse flow of waste from the cyclone of water
The crushed ore in the mill is mixed with water, forming a slurry, which is
discharged through a sieve with end discharge, which limits the particle size of the
discharged slurry. The withdrawn slurry is collected in a sump where it is diluted
with water before being pumped into a cyclone for classification. The cyclone of
water is designed to separate substandard ore discharged from the sump. The bottom
product is returned to the mill for further crushing of the out-of-specification
particles. The list of input and output streams is presented in Table 1.
WSM
OSG
SB
FWS
FCM
GCML
ZVS
PPS
Variables of input
Water supply to the mill
material, prepared for grinding
Metal balls
fill water sumpf
Flow rate of the circulating mixture
Output variables
general component of the mill loading
Cracking size of sump
The size of output particle
[м3/h]
[t/h]
[t/h]
[м3/h]
[м3/h]
[-]
[м3]
[-]
To describe the grinding process as shown in Figure 1, you can use a relatively
simple nonlinear dynamic model proposed by Le Roux et al. [8]. This model uses
the minimum number of refined parameters, but allows obtaining sufficiently
accurate corresponding model responses.
The model consists of four blocks describing a feeder, an SAG mill with a
diverting screen, a sump and a cyclone of water. Table 2 provides a description of
the indices for measured costs V and calculated by model X.
Table 2: Description of indexes
Low index
Description
X∆−
f-feeder; m - mill; h - sump; g - cyclone
of water
k - stones; including - solid particles; gh
- coarse particles; w - balls; c - water
i - inflow; o - exit; u - overflow
X−∆
X− − ∆
The first index indicates the module under consideration (feeder, mill, sump or
cyclone of water), the second indicates which of the six states is taken into account
(stones, solids, coarse particles, fine particles, balls, water), and in the case of flow
rates, the last subscript shows, whether it is inflow, overflow, or decreased flow. A
description of the continuous time mill circuit in state space is shown below.
V H H
H овм  WSM  v mw mw  VFWS
H ms  H mw
V H H
OSG
P
X mr
H ms 
(1   r )  v mw ms  VFSS  mill (
)
Ds
H ms  H mw
Ds r X mr  X ms
V H
H
P
OSG
 f  v mw mf  VFFS  mill /
Ds
H ms  H mw
Ds  f
H mf 
H
 H mr  H ms  H mb
[1   f ( mw
 Pmax )]
mill
P
H mr
OSG
H mr 
 к  mill (
)
Ds
D s к H mr  H ms
X mb
SB Pmill
H mb 

(
)
DB
b Ds ( X mr  X ms )  DB X mb
(1)
  Vv  H mw  H mw FCM  H mw
H sw 

 FWS
H ms  H mw
H mw  H ms
  Vv  H mw  H ms FCM  H ms
H ss 

H ms  H mw
H mw  H ms
  Vv  H mw  H mf FCM  H mf
H sf 

H ms  H m
H mw  H ms
where H mw , H ms , H mf , H mr , H mb are the volume of water, solid particles,
fines, rocks and balls in the mill, respectively, H sw , H ss , H sf are the volume of
water, solid particles and small particles in the sump, respectively, and Vhw , Vhs , Vhf
is the flow of water, solid particles and fines in the cyclone of water, respectively.
Since particulate matter is the sum of the fine and coarse ore, only the solids and
fines change is calculated, not the coarse ore change. The nomenclature of the model
is presented in tables 3.
Table3 : Values of circuit parameters and uncertainty
Circuit
Given
Parameter
Value
Δ
Details of circuit
f
0.05
50%
Fine part in raw product
r
0.47
60%
Rock part in raw product
P
1.0
 f
0.01
скор
0.71
 su
0.87
C1
0.6
stable
C2
0.4
stable
C3
4.0
stable
C4
4.0
stable
P
s
0.5
Power change parameter for solids in the mill
P
0.5
DB
7.85
Power change parameter for the volume of the
filled mill
Density of steel balls [t / m3]
DS
4.2
Density of the original ore [t / m3]
 sv
0.62
c
129
5%
b
90
6.6%
Maximum fraction of solids by volume of
grinding at 0 grinding flow
Parameter associated with coarse particles
[m3 / h]
Wear rate of steel [kW * h / t]
f
29.5
50%
r
7.1
20%
v
Partial power reduction by partial reduction
from the maximum mill speed
Partial change in kW / produced fines for a
change in the fractional filling of the mill
Fraction of the critical speed of the mill
15%
Parameter related to solids in the downstream
Power required per ton of fines produced
[kW * h / t]
Abrasion rate of rocks [kW * h / t]
P
1662
Rheology factor for maximum mill power input
Pmax
0.57
mill
120
Maximum power consumption of the mill
motor [kW]
Mill capacity [m3]
P
0.4
Vv
84
P
0
max
max
6000
Filled fraction of mill volume for maximum
power consumption
Volumetric flow rate for driving force "current
volume"
Cross time for maximum power consumption
The three outputs of the model are the fraction of the mill filled with the
GCML loading, the volume of the sump filled with the ZVS loading, and the
estimate of the particle size at the outlet of the PPS cyclone of water, which are
calculated by the formulas:
GCML  ( H mw  H ms  H mf  H mb ) /  mill
ZVS  H ss  H sw
(2)
PPS  Vhfo  Vhso
where Vhfo and Vhso are the volumetric flow rate of fine and solid particles at the
outlet of the cyclone of water, respectively. The intermediate equations required for
(1) for the mill are determined by the equations:
   1

 H
  max 0, 1  
 1  ms 
    s  H mw 


Pmill  Pmax 1   P Z x2  2 P  P  Ps Z x Z r   Ps Z r2  ( speed )  P
Zx 
Zr 
H mw  H mf  H ms  H mb
1
 mill   Pmax

 Pmax
1
where  is an empirically determined rheological coefficient, Pmill is the power
consumption of the mill, Z x is the effect of the charge inside the mill on the power
consumption, and Zr is the effect of the rheology of the charge in the mill on the
power consumption. The intermediate equations required for (1) and (2) related to
the cyclone are determined by the equations
С
С
  FCM    
 3    H sf  4 
FCM(Hss - Hsf ) 
H
ss
   1  
  1  

Vhfc 
1  C1 exp 
 

 
Hsw  Hss 

С
(
H

H
)
H
c
2
sw
ss
ss

  
   
 

V 
H ss 
  exp  hfc 
Fu  0.6   0.6 
H sw  H ss 

  su c 
H sw (Vhfc  Fu  Vhfc )
Vhfw 
Fu  H sw  Fu  H sf  H sf
Vhfo 
H sf (Vhfc  Fu  Vhfc )
Fu  H sw  Fu  H sf  H sf
Vhso  Vhfc 
H sf (Vhfc  Fu  Vhfc )
Fu  H sw  Fu  H sf  H sf
Vhso  Vsfs  Vhso
Vhfo  Vsff  Vhfo
where the flow rate of water, solid particles, coarse particles and fines in the bottom
flow of the cyclone of water have to be determined in sequence by Vhfw , Vhso , Vhfc
and Vhfo , the flow indication of solid and fine particles at the outlet from the sump
have to be determined by Vsfs and Vsff , in sequence, and Fu is the part of solid
particles in the bottom stream cyclone of water.
Table 4: Duty point of the grinding circuit
Variable
unreal
Min
Max
Unit of
measurement
Input data
FCM
300
100
350
м3/h
WSM
40
0
60
м3/h
SB
5.69
0
10
t/h
OSG
65.2
0
100
t/h
FWS
140.5
0
400
м3/h
0.25
0.45
particle
Output data
GCML
0.34
ZVS
5.99
1
8
м3
PPS
0.67
0.5
0.8
Particle
Table 5: Initial states of mill and settler
Condition
value
Unit of
measurement
Mill state
H mw
4.85
м3
H ms
4.90
м3
H mf
1.09
м3
H mr
1.82
м3
H mb
8.51
м3
Sump states
H sw
4.11
м3
H ss
1.88
м3
H sf
0.42
м3
In summary, it is clear that shifts in the composition of the ore and its hardness are
the main sources of uncertainties that have to be faced in modeling, especially when
the ore comes from different deposits.
A raise in ore hardness is modeled by a growth in the capacity required to produce
a ton of product (  f ) by 50% at a time of 10 minutes. The shift in the composition
of the ore is modeled by a raise in the share of raw materials (  r ) by 50% in a time
of 100 minutes. PSE is controlled by changing the section of the cyclone. The section
of the cyclone of water changes through the SFF [Figure. 2 (b)] and the loading
density of the cyclone of waters (SFD). SFD [Figure. 2 (b)] can be changed by
changing the density of the mill discharge in relation to the MIW to MSF [Figure 2
(b)], etc.
To ensure the effective operation of the cyclone, the control system must control the
SFD, PSE and the sump level (US) for which it is equipped with three degrees of
freedom [Figure. 2 (a)].
The PSE and mill load are maintained at the desired levels of 80% and 45%,
respectively, in a robust nonlinear model predictive control (RNMPC) [Figure. 2 (a)]
regardless of active disturbances. Figure. 2 (b) shows a slight decrease in the average
MFS due to the increased hardness of the ore. Differences in SFW may be due to
different hardness of the ore, which affects the residence time of the ore inside the
mill. Large variations in the pickup are needed to control the device of sound waves
in order to minimize the density of the suspension in the sump. In fig. 2 (a)
additionally shows product performance, slurry rheology within the mill, and mill
power input. The rheology factor depends on the water and solids inside the mill, as
shown in (6).
Rice. 2. Controlled variables, control variables and other important variables.
Dashed lines indicate constraints on the variable, and vertical dashed lines indicate
the onset of disturbing events.
To increase the throughput, the RNMPC controls the MIW and MFS by maintaining
the optimal conditions for destruction inside the mill, which are achieved at the
optimal value of the rheology coefficient equal to 0.51. The control system
compensates for the violation of the hardness of the original ore due to an increase
in MIW in comparison with MFS.
An increase in the MPF of the relative MFS goes with to an raise in the rheology
factor and, as a result, leads to a decrease in the power of the mill. RNMPC increases
SB [Figure. 2 (b)] to compensate for the higher rheological factor.
References
1. I. K. Craig, I. M. MacLeod, Specification framework for robust control of a runof-mine ore milling circuit, Control Eng. Practice 3 (1995) 621 – 630.
2. D. Wei and I. K. Craig, “Grinding mill circuits—A survey of control and
economic concerns,” Int. J. Mineral Process., vol. 90, no. 1–4, pp. 56–66, 2009.
3. M. Ramasamy, S. S. Narayanan, and C. D. P. Rao, “Control of ball mill grinding
circuit using model predictive control scheme,” J. Process Control, vol. 15, no. 3,
pp. 273–283, 2005.
4. R. K. Rajamani and J. A. Herbst, “Optimal control of a ball mill grinding circuit.
I. Grinding circuit modeling and dynamic simulation,” Chem. Eng. Sci., vol. 46, no.
3, pp. 861–870, 1991.
5. P. Mhaskar and A. B. Kennedy, “Robust model predictive control of nonlinear
process systems: Handling rate constraints,” Chem. Eng. Sci., vol. 63, no. 2, pp.
366–375, 2008.
6. M. Lazar, D. M. de la Pena, W. P. M. H. Heemels, and T. Alamo, “On input-tostate stability of min-max nonlinear model predictive control,” Syst. Control Lett.,
vol. 57, no. 1, pp. 39–48, 2008.
7.
8. A. Remes, J. Aaltonen, H. Koivo, Grinding circuit modeling and simulation of
particle size control at Siilinj¨arvi concentrator, Int. J. Mineral Processing 96 (2010)
70 – 78.
30. J. D. le Roux, I. K. Craig, D. G. Hulbert, A. L. Hinde, Analysis and validation
of a run-of-mine ore grinding mill circuit model for process control, Minerals Eng.
43-44 (2013) 121 – 134.
Download